The two huge RSJs have been placed on their pad stones and the scaffolding has been erected in preparation for the flat roof to be laid. We have used substantial RSJs to allow us to build a 2nd floor, should we need it in the future.

.

.

Categories: News
Published: 17, Jun, 2011