The large front window in the extension has now been installed and the roof is waterproof, thus sealing the extension as an enclosed unit. This has allowed us to remove the boarding at the front of the old house, hence connecting the extension to the existing building. The 2nd photo below shows the view from the old house looking through the old front door – into the new extension (the bright green colour is a bonding agent painted onto the walls by the plasterers – not our style of decorating!). The plasterers are back next week to plaster the new extension.
.